Hospital Electrical Safety & IEC 60601-1: Complete Applied Parts Testing

Protective Earth Continuity & Chassis Leakage Protocols

Module 1: IEC 60601-1 / IEC 62353 Standards35 min technical read

Protective Earth Continuity & Chassis Leakage Protocols

Module Executive Summary

Step-by-step procedure for measuring ground bond resistance with 200mA test current.

Earth Continuity Verification Protocol

Under IEC 62353, the protective earth resistance between the earth pin of the power plug and any exposed conductive metal part of the chassis must not exceed 0.2 ohms for equipment with a detachable power cord (or 0.3 ohms including cord).
Diagnostic Checkpoint Quiz

What is the maximum allowable protective earth continuity resistance for hospital medical devices with a detachable power cord under IEC 62353?